.jpg.webp)
SARAJEVO, (Patria) - In the operational office of the Public Enterprise Autoceste FBiH in Sarajevo, a public opening of bids for the construction of the Corridor 5c highway, section Poprikuše – Zenica North (Donja Gračanica), subsection Ponirak-Vraca, was held yesterday, it was announced from Autoceste FBiH.
Offers for the construction of the Ponirak-Vraca subsection were submitted by the companies CENGIZ INSAAT SANAYI VE TICARET A.S. (Turkey) and EURO-ASFALT d.o.o. (Bosnia and Herzegovina).
The Ponirak – Vraca subsection is 2.65 km long, and the most significant structure on the subsection is the Zenica tunnel with a length of 2475 m for the left tube and 2420 m for the right tube.
The planned construction period is 30 months.
The construction of the Ponirak-Vraca subsection will be financed by funds secured from the European Investment Bank (EIB) in the amount of 50 million euros and WBIF grant funds.
Komentari (0)
Prijavite se za komentiranje
PrijavaJos nema komentara. Budite prvi!
Minuta
Sve →Iz drugih kategorija

High Representative Not Elected: Germans, French and British Sabotaged Americans, New Attempt at End of June

ČOVIĆ WITHOUT MERCY: How Those Who Brought Ademović to Office Created a Political Hell for Him




Sunny Saturday, quite warm




Tragedy in Albanian resort: Two minors drown













