
Public enterprise Autoceste FBiH is organizing the ceremonial opening of the Sarajevo West - Tarčin motorway tomorrow at 2 PM at the Tarčin interchange, reports the BH News Agency Patria
- The Sarajevo West – Tarčin section is the largest infrastructure project being completed in Bosnia and Herzegovina. With the opening of this section to traffic, Zenica and Tarčin will be connected by motorway. In less than two years, with the engagement of 2,000 workers, 20 kilometers of motorway have been built, of which 5.5 kilometers are tunnels and 1.5 kilometers are bridges - it was announced from Autoceste FBiH.
Before the ceremonial ceremony, a tour of the Sarajevo West - Tarčin section will be organized, with the desire for the BiH public to be adequately informed, and for us to offer the best possible video recordings and photos.
Tour plan:
11:00 AM arrival of journalists at the Tarčin interchange and accommodation in organized transport
11:00 AM – 1:00 PM tour of the entire section with stops at the following locations for recording and photography:
- Tarčin Interchange
- Grab Tunnel
- 25. Novembar Tunnel
- Vis Tunnel
- M2 and M1 Bridges
- Lepenica Interchange
- Igman Tunnel
- Gaj Tunnel
- Šamin Gaj Viaduct
- Vlakovo Toll Station
- Gladno Polje Viaduct
- Vlakovo Interchange
From 1 PM, interviews will be taken, and at 2 PM, the ceremonial opening of the motorway. Watch the video here
Komentari (0)
Prijavite se za komentiranje
PrijavaJos nema komentara. Budite prvi!
Minuta
Sve →Iz drugih kategorija

High Representative Not Elected: Germans, French and British Sabotaged Americans, New Attempt at End of June

ČOVIĆ WITHOUT MERCY: How Those Who Brought Ademović to Office Created a Political Hell for Him




Sunny Saturday, quite warm




Tragedy in Albanian resort: Two minors drown













