
The signing of the Contract for the construction of the Vranduk – Ponirak subsection on Corridor 5C will be signed on Wednesday at the headquarters of JP Autoceste FBiH in Mostar.
The contract will be signed by Adnan Terzić, director of JP Autoceste FBiH as the investor, and on behalf of the consortium of contractors, Ahmet Murat Turkoglu, director of Azvirt L.L.C (Azerbaijan) and Mario Bevanda, on behalf of Hering d.d. Široki Brijeg (BiH), with Denis Lasić, Minister of Transport and Communications of FBiH, acting as a witness.
The value of the Contract for the construction of the Vranduk – Ponirak subsection is 76.5 million euros with VAT, and the loan funds have been secured through the OPEC Fund for International Development (OFID).
The Vranduk – Ponirak motorway route is part of the Poprikuše – Zenica North (Donja Gračanica) section, which continues to the north with the Nemila – Vranduk subsection and to the south with the Ponirak – Vraca subsection.
On a length of 5.3 kilometers, retaining walls, two bridges, three viaducts, and a tunnel will be built. The planned construction period is 24 months.
Komentari (0)
Prijavite se za komentiranje
PrijavaJos nema komentara. Budite prvi!
Minuta
Sve →Iz drugih kategorija

High Representative Not Elected: Germans, French and British Against Americans, New Attempt at End of June

ČOVIĆ WITHOUT MERCY: How Those Who Brought Ademović to Office Created a Political Hell for Him




Sunny Saturday, quite warm




Tragedy in Albanian resort: Two minors drown













