Signing of the Contract for a New Section on Corridor 5C

Patria
AutorPatria
13:39
Podijeli:
Signing of the Contract for a New Section on Corridor 5C

The signing of the Contract for the construction of the Vranduk – Ponirak subsection on Corridor 5C will be signed on Wednesday at the headquarters of JP Autoceste FBiH in Mostar.

The contract will be signed by Adnan Terzić, director of JP Autoceste FBiH as the investor, and on behalf of the consortium of contractors, Ahmet Murat Turkoglu, director of Azvirt L.L.C (Azerbaijan) and Mario Bevanda, on behalf of Hering d.d. Široki Brijeg (BiH), with Denis Lasić, Minister of Transport and Communications of FBiH, acting as a witness.

The value of the Contract for the construction of the Vranduk – Ponirak subsection is 76.5 million euros with VAT, and the loan funds have been secured through the OPEC Fund for International Development (OFID).
The Vranduk – Ponirak motorway route is part of the Poprikuše – Zenica North (Donja Gračanica) section, which continues to the north with the Nemila – Vranduk subsection and to the south with the Ponirak – Vraca subsection.

On a length of 5.3 kilometers, retaining walls, two bridges, three viaducts, and a tunnel will be built. The planned construction period is 24 months.
 

Komentari (0)

Prijavite se za komentiranje

Prijava

Jos nema komentara. Budite prvi!

Minuta

Sve →

Iz drugih kategorija